How It Works
Typical project process timeline
1Initial free consultation
Let’s discuss your water saving & consultancy requirements
2Bill validation
Water bill validation checking for discrepancies, over charges, high consumption etc.
3Site survey
Water audit and efficiency site survey to establish where savings can be made
4Analysis report
Detailed report produced from the data obtained from the site survey
5Consultation to present findings
Meeting to present reports and to discuss solutions
6Refunds and reductions
Negotiate with water company to maximise potential refunds and future savings
7Installation
Installation of efficiency measures and / or repairs to pipework
8Bill validation to prove savings
AMR or sub-metering can be installed to prove success of project
Scope of works
Water Conservation, Efficiency Solutions and Project Management
- Use data collected to project calculate project feasibility and paybacks
- Install standard or web based smart sub-metering to verify projects
- Recommend / supply best products to suit individual or group site needs
- Installation of products
- Implement required PPM site visits
- Servicing and repairs
- Reactive maintenance and support
- Management of data and alert from smart systems
Water Consultancy
Water Bill Data Analysis – Office Based
- Extract information from water bills via desk top exercise
- Analyse historical billing for errors and overcharges breaking out consumption and fixed cost data. Historic billing will be analysed for errors and rebates applied for
- Profile site usage against average usage to estimate potential issues on site
- Inspect tariffs and fixed charges for potential savings
- Analyse staffing levels and details of water usage other than domestic. A data catch sheet will be provided
- Verify the water company / retailer’s charges
- Inspect the water company sewer records, consider solutions for natural drainage in readiness for site visit
- Compile report to submit for each site either individually or collectively with findings taken from above activities
- Quantifying of current water charges for clients wishing to consider a Self- Supply option
- Preparation of tenders for clients wishing to obtain quotations from water retailers
- Scrutiny of tender results, recommendations, and future on-going support.
Water Audit & Feasibility Study – Site Based- Record meter/s usage, short and long term
- Identify meter/s for a pulsed outlet for data logger fit to enable automatic meter reading (AMR)
- Meter/s size and serial number check against water company annual charges
- Profile meter/s against historic reads from bills
- Identify annual cost savings for downsize of meter/s if site can cope with reduced maximum demand
- Consumption auditing and reporting with improvement recommendations
- Inspect all water outlets throughout the building
- Identify reduction of tap flows and recommend replacement of taps where necessary
- Best practice advice to kitchen staff, if applicable
- Identify if urinal cisterns are controlled
- Inspect WCs for dual flush and overflows
- Identify and inspect tanks for overflow and condition
- Identify and inspect water softeners, advice on installation
- Identify if the water supply after the meter feeds other properties
- Identify non-returns for waste allowances including evaporative loss
- Identify staff / operator or appliance inefficiencies
- Check site drainage plans and compare with water company charges for potential surface water drainage savings
- Offer advice on site containment of contamination potential
- Isolate valves and observe meter volume reaction
- Pinpoint specific problem areas
- Understand leakage history of the site
- Listen for leakage noise using sensitive ground microphones
- Quantify leak volume and calculate annual cost to set budgets for leak/find/fix work
- Offer advice on sub-metering to better understand consumption in specific areas of a site
- Advice on non-return to sewer allowances
- Identify and inspect fire main & hydrants
- Check fire water separation from water supply
- Test dry risers and record pressures
- Hydrants - check service and maintenance records and testing regime
- Highlight concerns during water audit and follow up in report
- Identify potential areas to install sub-meters and/or valves, to gain better control of water usage
- Identify potential for Grey Water / Rain Water Harvesting following up with feasibility study
- Check potential for installing a bore hole
- Check potential savings by moving from a standard waste rate to a trade effluent charge
- Inspect trade effluent charges and advise on reductions
- Advise on improving the TE sampling areas
- Advise on insulation to protect against frost or to prevent the transfer or loss of heat
- Advise on existing interceptors and their maintenance
- Advise on Disaster Management
- Take samples of potable or ground water and send for detailed laboratory analysis
- Offer advice on the importance of completing risk assessment to ensure the site is water quality compliant
H2OiQ Limited © 2024